Malaysia Projects

Bintulu, Sarawak

Detail Engineering of Piping Support Adequacy Checks for AGRU in MLNG and MLNG Dua Project

Client:PETRONAS Technical Services Sdn Bhd (PTSSB)
Year:2012
Location:Bintulu, Sarawak, Malaysia
Service:E
Date of Completion :Feb 2014

Basic Engineering Design & Soil Investigation Package for Bintulu Metal Silicone Plant

Client:SOJITZ Corporation (SOJITZ)
Year:2011
Location:Bintulu, Sarawak, Malaysia
Service:BED & SI
Date of Completion :Aug 2011

Gas Chiller Station at SSGP Project

Client:Punj Lloyd Oil & Gas (Malaysia) Sdn Bhd
Year:2010
Service:E
Date of Completion :Sept 2012

Steel Structure Assembling, Equipment Installation, Piping Work, Painting & Fireproofing

Client:JGC-KBR-SIME Consortium (JGC-KBR-SIME)
Year:2001
Location:Bintulu, Sarawak, Malaysia
Service:Construction
Date of Completion :June 2002

Butterworth, Penang

KR2-Isomer Catalyst Change

Client:Toray Industries Inc. (Toray)
Year:2007
Location:Butterworth, Penang, Malaysia
Service:Construction
Date of Completion :April 2007 (as per schedule)

FCM-Recovery Project

Client:Fatty Chemical (Malaysia) Sdn Bhd (FCM)
Year:2006
Location:Butterworth, Penang, Malaysia
Service:E
Date of Completion :April 2006

FCM-Recovery Project

Client:Fatty Chemical (M) Sdn Bhd (FCMSB)
Year:2006
Location:Butterworth, Penang, Malaysia
Service:E
Date of Completion :April 2006 (as per schedule)

Fatty Alcohol Plant Expansion

Client:Fatty Chemical (Malaysia) Sdn Bhd (FCMSB)
Year:2000
Location:Butterworth, Penang, Malaysia
Service:E.P.C
Date of Completion :June 2002 (as per schedule)

Fatty Alcohol No. 2

Client:Fatty Chemical (Malaysia) Sdn Bhd (FCMSB)
Year:1991
Location:Butterworth, Penang, Malaysia
Service:E.P.C.
Date of Completion :As per schedule

Fatty Alcohol No. 1

Client:Fatty Chemical (Malaysia) Sdn Bhd (FCMSB)
Year:1988
Location:Butterworth, Penang, Malaysia
Service:E.P.C
Date of Completion :As per schedule

Kerteh, Terengganu

FEED Handling Rich Composition in Feedstock (CHROME)

Client:PETRONAS Gas Berhad (PGB)
Year:2023
Location:Kerteh, Terengganu
Service:E
Date of Completion:Ongoing (Sept 2023)

EPCC for New Ethylene Export Facility for COCONUT Project

Client:PETRONAS Chemical Olefins Sdn Bhd
Year:2021
Location:Kerteh, Terengganu
Service:EPCC
Date of Completion:Dec 2022

EPCC for Black Condensate & Heat Integration (BCHI) Project

Client:PETRONAS Penapisan (Terengganu) Sdn Bhd
Year:2020
Location:Kerteh, Terengganu
Service:EPCC
Date of Completion:Ongoing (April 2023)

EPCC of Acid Gas Oxidizer (AGO) Project

Client:PETRONAS Gas Berhad (PGB)
Year:2020
Location:Kerteh, Terengganu
Service:EPCC
Date of Completion:Ongoing (April 2023)

EPCC for Black Condensate & Heat Integration (BCHI) Project

Client:PETRONAS Gas Berhad (PGB)
Year:2020
Location:Kerteh, Terengganu, Malaysia
Service:EPCC
Date of Completion :Ongoing (Dec 2021)

EPCC of Acid Gas Oxidizer (AGO) Project

Client:PETRONAS Gas Berhad (PGB)
Year:2020
Location:Kerteh, Terengganu, Malaysia
Service:EPCC
Date of Completion :Ongoing (Nov 2022)

EPCC of Asset Life Extension and Improvement (GPP6) Project

Client:PETRONAS Gas Berhad (PGB)
Year:2018
Location:Kerteh, Terengganu, Malaysia
Service:EPCC
Date of Completion :Mar 2019

Provision of Engineering, Procurement, Construction and Commissioning (EPCC) for Activated Carbon Filter (ACF) Project

Client:PETRONAS Gas Berhad (PGB)
Year:2015
Location:Kerteh, Terengganu
Service:EPCC
Date of Completion:Jan. 2016

FEED Gas Cooler

Client:PETRONAS Gas Berhad (PGB)
Year:2013
Location:Kerteh, Terengganu
Service:Delivery, Installation & Commissioning
Date of Completion:Sept, 2013

FEED Liquid Landing Pressure & Flow Rate Improvement at GPPA & B

Client:PETRONAS Gas Berhad (PGB)
Year:2013
Location:Kerteh, Terengganu, Malaysia
Service:FS
Date of Completion :Feb, 2013

Angsi Chemical Enhanced Oil Recovery (CEOR) Onshore Project

Client:Water Standard Malaysia Sdn Bhd
Year:2013
Location:Kerteh, Terengganu, Malaysia
Date of Completion :Dec, 2013

Feasibility Study for TCOT & GPP1 LPGU Debottlenecking

Client:PETRONAS Gas Berhad (PGB)
Year:2012
Location:Kerteh, Terengganu, Malaysia
Service:FS
Date of Completion :June, 2012

Provision of Engineering, Procurement, Construction and Commissioning (EPCC) for Plant Rejuvenation and Revamp 4 (PRR4) Project

Client:Petronas Gas Berhad (PGB)
Year:2012
Location:Kerteh, Terengganu, Malaysia
Service:EPCC
Date of Completion :March 2015

Technology Selection Study of New Acid Gas Removal Unit (AGRU)

Client:PETRONAS Gas Berhad (PGB)
Year:2010
Location:Kerteh, Terengganu, Malaysia
Service:Consultancy
Date of Completion:July, 2012

The Engineering, Procurement, Construction and Commissioning for the Flare Gas Recovery Unit Project (FGRU)

Client:PETRONAS Gas Berhad (PGB)
Year:2011
Service:EPCC
Date of Completion:June, 2014

Flare Gas Recovery Project

Client:PETRONAS Gas Berhad (PGB)
Year:2010
Location:Kerteh, Terengganu, Malaysia
Service:DFS & BED
Date of Completion :Nov, 2010

PRR2 Basic Engineering Design

Client:PETRONAS Gas Berhad (PGB)
Year:2009
Location:Kerteh, Terengganu, Malaysia
Service:BED
Date of Completion :November 2009

New Aeration Basin Project

Client:Optimal Chemicals (M) Sdn Bhd (Optimal)
Year:2007
Location:Kerteh, Terengganu, Malaysia
Service:E.P.C.C
Date of Completion :May 2009

Charge Gas Compressor (CGC) and Rundown Project

Client:Ethylene Malaysia Sdn Bhd (EMSB)
Year:2006
Location:Kerteh, Terengganu, Malaysia
Service:E.P.C.C
Date of Completion :Dec 2008 Completed

Optimal EO Reactor Replacement Plant

Client:Optimal Group of Companies (Optimal)
Year:2005
Location:Kerteh, Terengganu, Malaysia
Service:E.P.C
Date of Completion :Feb 2008 Completed

Engineering, Procurement & Construction KR-2 Debottlenecking Project

Client:Aromatics Malaysia Sdn Bhd & PETRONAS Penapisan Terengganu Sdn Bhd (AMSB & PPTSB)
Year:2004
Location:Kerteh, Terengganu, Malaysia
Service:E.P.C.
Date of Completion :May 2005

Flare System Upgrading (FSU) Project

Client:Ethylene Malaysia Sdn Bhd (EMSB)
Year:2004
Location:Kerteh, Terengganu, Malaysia
Service:E.P.C.C
Date of Completion :Mar 2006

Selangor

EPC of M7-T Batch Plant Improvement Work

Client:Nippon Electric Glass (M) Sdn Bhd (NEGM)
Year:2023
Location:Shah Alam, Selangor
Service:EPC
Date of Completion:Ongoing (Aug 2023)

EPC UPP Blowdown Tank D-120C

Client:Cosmo Scientex (M) Sdn Bhd
Year:2023
Location:Shah Alam, Selangor
Service:EPC
Date of Completion:Ongoing (May 2024)

EPC of M4-T Tubing Project

Client:Nippon Electric Glass (M) Sdn Bhd (NEGM)
Year:2022
Location:Shah Alam, Selangor
Service:EPC
Date of Completion:Feb 2023

EPC of M2-T Fiber Batch Plant & MG Plant Fabrication

Client:Nippon Electric Glass (M) Sdn Bhd (NEGM)
Year:2021
Location:Shah Alam, Selangor
Service:EPC
Date of Completion:Dec 2022

EPC of New Chimney

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:2019
Location:Shah Alam, Selangor, Malaysia
Service:EPC
Date of Completion:Feb 2020

EPC UPP Hot Oil Boiler Replacement

Client:Cosmo Scientex (M) Sdn Bhd (CSMSB)
Year:2019
Location:Shah Alam, Selangor, Malaysia
Service:EPC
Date of Completion:Dec 2019

EPC of Peresscol Expansion Project

Client:Peresscol Sdn Bhd
Year:2018
Location:Ulu Klang, Selangor, Malaysia
Service:EPC
Date of Completion:Aug 2018

EPC of Peresscol Expansion Project

Client:Peresscol Sdn Bhd
Year:2018
Location:Ulu Klang, Selangor, Malaysia
Service:EPC
Date of Completion:Ongoing (July 2018)

UPPE3 Expansion Project

Client:Cosmo Scientex (M) Sdn Bhd (CSMSB)
Year:2016
Location:Selangor, Malaysia
Service:EPC
Date of Completion:July 2017

Glass Fiber, Tube and CRT Plant

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:1995 until Present
Location:Selangor, Malaysia
Service:Upgrading & Maintenance
Date of Completion:Yearly Basis.

New Reactor Expansion Plant

Client:Cosmo Scientex (M) Sdn Bhd (CSMSB)
Year:2009
Location:Selangor, Malaysia
Service:Detail Cost Estimation
Date of Completion :March 2010

Hot Oil Burner and Refurbishment of MDI Melting Bath

Client:Cosmo Scientex (M) Sdn Bhd (CSMSB)
Year:2012
Location:Pulau Indah, Selangor
Date of Completion:July, 2013

Material Handling and After Process

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:2009
Location:Selangor, Malaysia
Service:E.P.C.
Date of Completion :December 2009

Glass Fiber, Tube and CRT Plant

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:2008
Location:Selangor, Malaysia
Service:E.P.C
Licensor:-
Date of Completion :Dec 2009 (as per schedule)
Approx Contract Value (RM '000):-

Material Planning And After Process

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:2007
Location:Selangor, Malaysia
Service:E.P.C
Licensor:-
Date of Completion :Dec 2007 (as per schedule)
Approx Contract Value (RM '000):-

Expansion Project

Client:Esterol Sdn Bhd (Esterol)
Year:2006
Location:Selangor, Malaysia
Service:BEP, FEED & TIC
Licensor:-
Date of Completion :Sept 2006 (as per schedule)
Approx Contract Value (RM '000):-

Upgrading Works for Year 2006

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:2006
Location:Selangor, Malaysia
Service:P.C
Licensor:-
Date of Completion :Dec 2006 Completed
Approx Contract Value (RM '000):-

Upgrading Works for Year 2005

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:2005
Location:Selangor, Malaysia
Service:P.C
Licensor:-
Date of Completion :Dec 2005 (as per schedule)
Approx Contract Value (RM '000):-

Urethane Prepolymer Plant

Client:Cosmo Scientex (M) Sdn Bhd (CSMSB)
Year:2002
Location:Selangor, Malaysia
Service:E.P.C
Licensor:-
Date of Completion :July 2003 (as per schedule)
Approx Contract Value (RM '000):-

DR & SE Machine Installation Work

Client:Nippon Eletric Glass (M) Sdn Bhd (NEGSB)
Year:2001
Location:Selangor, Malaysia
Service:P.C.
Licensor:-
Date of Completion :May 2002 (as per schedule)
Approx Contract Value (RM '000):-

Oven Blower Fan & Ducting

Client:Matsushita Electronics Corp (M) Sdn Bhd (MECSB)
Year:2000
Location:Selangor, Malaysia
Service:P.C.
Licensor:-
Date of Completion :As per schedule
Approx Contract Value (RM '000):-

M2TF-2BC Bag Filter Supply

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:2000
Location:Selangor, Malaysia
Service:P.C.
Licensor:-
Date of Completion :Oct 2000 (as per schedule)
Approx Contract Value (RM '000):-

M3-5 C/E Transportation System

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:2000
Location:Selangor, Malaysia
Service:P.C.
Licensor:-
Date of Completion :Sept 2000 (as per schedule)
Approx Contract Value (RM '000):-

Piping Work for P-1, -2, -3 Waste Water

Client:Nippon Electric Glass (NEGSB)
Year:2000
Location:Selangor, Malaysia
Service:C
Licensor:-
Date of Completion :As per schedule
Approx Contract Value (RM '000):-

CRT Glass Plant No. 7

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:2000
Location:Selangor, Malaysia
Service:P.C.
Licensor:-
Date of Completion :July 2001 (as per schedule)
Approx Contract Value (RM '000):-

Oleo Chemical

Client:Palmamide Sdn Bhd (PSB)
Year:1996
Location:Selangor, Malaysia
Service:E.P.C
Licensor:Lion Engineering
Date of Completion :As per schedule
Approx Contract Value (RM '000):-

CRT Glass Plant

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:1995
Location:Selangor, Malaysia
Service:E.P.C.
Licensor:-
Date of Completion :As per schedule
Approx Contract Value (RM '000):-

CRT Plant

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:1995
Location:Selangor, Malaysia
Service:E.P.C.
Licensor:-
Date of Completion :As per schedule
Approx Contract Value (RM '000):-

CRT Glass Plant

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:1994
Location:Selangor, Malaysia
Service:E.P.C.
Licensor:-
Date of Completion :As per schedule
Approx Contract Value (RM '000):-

CRT Plant /Production Control Network

Client:Matsushita Electronics Corp (M) Sdn Bhd (MECSB)
Year:1994
Location:Selangor, Malaysia
Service:E.P.C.
Licensor:-
Date of Completion :As per schedule
Approx Contract Value (RM '000):-

CRT Glass Plant Control Network

Client:Nippon Electric Glass (M) Sdn Bhd (NEGSB)
Year:1991
Location:Selangor, Malaysia
Service:E.P.C.
Licensor:-
Date of Completion :As per schedule
Approx Contract Value (RM '000):-

Formalin

Client:Malaysia Adhesive & Chemicals Sdn Bhd (MACSB)
Year:1970
Location:Selangor, Malaysia
Service:E.P.S.C
Licensor:Mitsui Chemicals Inc.
Date of Completion :As per schedule
Approx Contract Value (RM '000):-

Kuala Lumpur

Detailed Engineering of 24" Benfield Solution at NH3 Plant of PKFSB

Client:Petronas Technical Services Sdn Bhd (PTSSB)
Year:2012
Location:KEDAH
Service:FEED
Licensor:-
Date of Completion:Aug 2012
Approx Contract Value (RM '000):N/A

PSR2 Turnaround Construction Assistance

Client:PETRONAS Penapisan Melaka Sdn Bhd (PPMSB)
Year:2010
Location:MELAKA
Service:Advisory
Licensor:-
Date of Completion:March 2010
Approx Contract Value (RM '000):-

Project Management Services for PROTON's Tanjung Malim Plant

Client:Nissho Iwai Corporation (NIC)
Year:2001
Location:SELANGOR
Service:P.M.E.C
Licensor:-
Date of Completion:Oct 2001 (as per schedule)
Approx Contract Value (RM '000):-

Seremban

TIPP Polyester Plant

Client:T.I.P.P (Malaysia) Sdn Bhd (TIPP)
Year:2005
Location:Seremban, Malaysia
Service:E.P.C.C
Date of Completion:May 2006

Factory Expansion Phase 2

Client:T.I.P.P. (Malaysia) Sdn Bhd (TIPP)
Year:2001
Location:Seremban, Malaysia
Service:E.P.C.
Date of Completion:Dec 2001 (as per schedule)

TIPP Expansion Project

Client:T.I.P.P. (Malaysia) Sdn Bhd (TIPP)
Year:2000
Location:Seremban, Malaysia
Service:P.M.
Date of Completion:Jan 2001 (as per schedule)

Construction of Storage House

Client:T.I.P.P. (Malaysia) Sdn Bhd (TIPP)
Year:2000
Location:Seremban, Malaysia
Service:E.P.C
Date of Completion:Mar 2001 (as per schedule)

Resin Plant

Client:T.I.P.P (Malaysia) Sdn Bhd (TIPP)
Year:1995
Location:Seremban, Malaysia
Service:E.P.C.
Licensor:Toyo Ink
Date of Completion:As per schedule

Johor

BEPCC of Outside Battery Limit (PHOENIX-OSBL) Facility Project for Pengerang Integrated Complex (PIC)

Client:PRPC Utilities & Facilities Sdn. Bhd.
Year:2024
Location:Pengerang, Johor
Service: BEPCC
Date of Completion :Ongoing (September 2027)

EPC for Acetylene Hydrogenation Unit (AHU) Project

Client:Lotte Chemical TITAN (M) Sdn Bhd
Year:2022
Location:Pasir Gudang, Johor
Service:EPC
Date of Completion :November 2023

BED Study for LPG Cracking Terminal 2

Client:Lotte Chemical TITAN (M) Sdn Bhd
Year:2022
Location:Pasir Gudang, Johor
Service:E
Date of Completion :Nov 2022

Feasibility Study of ChilliPadi 2 Project

Client:Arkema Coating Resins Malaysia Sdn Bhd
Year:2022
Location:Pasir Gudang, Johor
Service:E
Date of Completion :Nov 2022

Inter Tank Transfer Reduction

Client:Bunge Loders Croklaan Oils Sdn Bhd
Year:2019
Location:Pasir Gudang, Johor, Malaysia
Service:EPs
Date of Completion :Feb 2020

48" Effluent Pipeline Replacement at FNC Plant

Client:Lotte Chemical TITAN (M) Sdn Bhd
Year:2019
Location:Pasir Gudang, Johor, Malaysia
Service:E
Date of Completion :Jan 2020

Basic Design Package for Inter Tank Transfer Reduction

Client:Bunge Loders Croklaan Oils Sdn Bhd
Year:2019
Location:Pasir Gudang, Johor, Malaysia
Service:E
Date of Completion :May 2019

Steam Cracker Complex for RAPID Project

Client:PRPC Refinery and Cracker Sdn Bhd
Year:2014
Location:Pengerang, Johor
Service:EPCC
Date of Completion:Ongoing

Idemitsu E305 Expansion Project

Client:Idemitsu SM (Malaysia) Sdn Bhd
Year:2015
Service:EPC
Date of Completion:May 2016

Procurement and Construction of Butadiene Transfer Line Project

Client:Lotte Chemical Titan (M) Sdn Bhd
Year:2013
Service:P & C
Date of Completion:September 2014

Provision of Project Management & Engineering Services for the Proposed Second LNG Regasification Facilities (RGT-2)

Client:PETRONAS Technical Services Sdn Bhd (PTSSB)
Year:2012
Location:Johor, Malaysia
Service:BED/FEED
Date of Completion:November 2012

The Engineering, Procurement, Construction and Commissioning of a Bio-Refinery Production Facility (Initial Production - Ethanol)

Client:Malaysian Bio-Xcell Sdn Bhd (MBX)
Year:2011
Location:Johor, Malaysia
Service:EPCC
Date of Completion:March, 2013

TPC2 Heat Exchanger Energy Improvement, Runback Condensor & Flare Tie-in Project

Client:Titan Petchem (M) Sdn Bhd (Titan)
Year:2010
Location:Johor, Malaysia
Service:E.P.C.
Date of Completion:November 2010

Plant Service Engineering & Construction

Client:Titan Petchem (M) Sdn Bhd (Titan)
Year:2010
Location:Johor, Malaysia
Service:Services & Construction
Date of Completion:November 2010

Installation of Liquid Dryer

Client:Titan Petchem (M) Sdn Bhd (Titan)
Year:2009
Location:Johor, Malaysia
Service:E.P.C.
Date of Completion:November 2010

Idemitsu Ethylene Pipieline

Client:Idemitsu SM (Malaysia) Sdn Bhd (Idemitsu)
Year:2009
Location:Johor, Malaysia
Service:Design Study & Cost Estimation
Date of Completion:October 2009

Benzene Toluene Splitter

Client:Idemitsu SM (Malaysia) Sdn Bhd (Idemitsu)
Year:2008
Location:Johor, Malaysia
Service:E.P.C.C
Date of Completion:Mar 2009 (as per schedule)

Tank Extension

Client:Idemitsu SM (Malaysia) Sdn Bhd (Idemitsu)
Year:2007
Location:Johor, Malaysia
Service:Design Study
Date of Completion:June 2007 (as per schedule)

TPC1 Liquid Dryer Package

Client:Titan Petchem (M) Sdn Bhd (Titan)
Year:2005
Location:Johor, Malaysia
Service:E.P.C
Date of Completion:Mar 2006 (as per schedule)

Total Investment Cost Study for Propylene, Butadiene Plant including Off-Site & Utility

Client:Titan Petchem (M) Sdn Bhd (Titan)
Year:2005
Location:Johor, Malaysia
Service:TIC
Date of Completion:Dec 2005 (as per schedule)

Kuantan

EPC of Spent Catalyst Recovery Facility (SCaRF)

Client:Taiyo Koko Malaysia Sdn. Bhd.
Year:2024
Location:Kuantan, Pahang
Service:EPC
Date of Completion :Ongoing (December 2026)

EPsCm 2-EHAcid II Plant

Client:BASF PETRONAS Chemicals Sdn Bhd
Year:2022
Location:Kuantan, Pahang
Service:EPsCm
Date of Completion :Ongoing (Nov 2023)

EPC PVOH Big Bag Unloading and RO Reject Water Recovery

Client:Eastman Interlayers (M) Sdn Bhd
Year:2022
Location:Kuantan, Pahang
Service:EPC
Date of Completion :Ongoing (March 2023)

EPC for Varnish System Capacity Upgrade

Client:Eastman Interlayers (M) Sdn Bhd
Year:2022
Location:Kuantan, Pahang
Service:EPC
Date of Completion :Ongoing (March 2023)

EPC for Silicone GMP Blending Facility for Project Brant

Client:BRB Malaysia Sdn Bhd
Year:2020
Location:Kuantan, Pahang
Service:EPC
Date of Completion :Sept 2021

Relocation of Scalpers and Hopper Work

Client:Flexsys Chemical (M) Sdn Bhd
Year:2019
Location:Kuantan, Pahang, Malaysia
Service:PC
Date of Completion :Jan 2020

Site Water Reservoir Project

Client:Flexsys Chemical (M) Sdn Bhd
Year:2019
Location:Kuantan, Pahang, Malaysia
Service:EPC
Date of Completion :Nov 2019

K2C Expansion 6 Mini Package

Client:Flexsys Chemical (M) Sdn Bhd
Year:2019
Location:Kuantan, Pahang, Malaysia
Service:P&C
Date of Completion :May 2019

Fire Water Line 16" Tie-in CoPoly K2C

Client:Flexsys Chemical (M) Sdn Bhd
Year:2019
Location:Kuantan, Pahang, Malaysia
Service:PCC
Date of Completion :Apr 2019

Starfruit Acrylic Acid Plant

Client:BASF PETRONAS Chemicals Sdn Bhd
Year:2018
Location:Kuantan, Pahang, Malaysia
Service:FEED
Date of Completion :May 2019

Tritan Phase 1 Project

Client:Flexsys Chemical (M) Sdn Bhd
Year:2018
Location:Kuantan, Pahang, Malaysia
Service:PC
Date of Completion :Oct 2018

20" Low Pressure Steam Pipe Line

Client:BASF PETRONAS Chemicals Sdn Bhd
Year:2018
Location:Kuantan, Pahang, Malaysia
Service:E
Date of Completion :Oct 2018

K2C Filter Automation Project

Client:Flexsys Chemical (M) Sdn Bhd
Year:2018
Location:Kuantan, Pahang, Malaysia
Service:EPC
Date of Completion :Decv 2018

K2C Deinventory Solutions Phase 2

Client:Flexsys Chemical (M) Sdn Bhd
Year:2018
Location:Kuantan, Pahang, Malaysia
Service:EPC
Date of Completion :June 2018

EPC of Reflux Tank Replacement Project

Client:FPG Oleochemicals Sdn Bhd (FPG)
Year:2018
Location:Gebeng, Kuantan, Malaysia
Service:EPC
Date of Completion:April, 2018

PCC of Branching of Steam Pipe for Eastman Kuantan Malaysia

Client:Flexsys Chemical (M) Sdn Bhd
Year:2017
Location:Gebeng, Kuantan, Malaysia
Service:PCC
Date of Completion:April, 2018

E2-EHAcid Project

Client:BASF Petronas Chemicals Sdn Bhd (BPCSB)
Year:2015
Location:Gebeng, Kuantan
Service:EPCm
Date of Completion:August 2016

EPC of Bottle-On Site-Blowing (BOB) Factory Expansion Project

Client:FPG Oleochemicals Sdn Bhd (FPG)
Year:2012
Location:Gebeng, Kuantan, Malaysia
Service:EPC
Date of Completion:May, 2013

Detail Engineering Services for Chiller Replacement Project

Client:FPG Oleochemicals Sdn Bhd (FPG)
Year:2011
Location:Gebeng, Kuantan, Malaysia
Service:E
Date of Completion:March, 2012

Heat Exchanger Unit E5231

Client:MTBE Malaysia Sdn Bhd (MTBE)
Year:2010
Location:Gebeng, Kuantan, Malaysia
Service:EPC
Date of Completion:Nov, 2010

PSV Study for Oxo C4 & Syngas Plant

Client:BASF Petronas Chemicals Sdn Bhd (BPCSB)
Year:2010
Location:Gebeng, Kuantan, Malaysia
Service:PSV Study
Date of Completion:June 2010

Glycerine Still Modification Work

Client:FPG Oleochemicals Sdn Bhd (FPG)
Year:2009
Location:Gebeng, Kuantan, Malaysia
Service:E.P.C.
Date of Completion:July 2010

LLI Procurement Services & Cost Study

Client:FPG Oleochemicals Sdn Bhd (FPG)
Year:2008
Location:Gebeng, Kuantan, Malaysia
Service:Consultancy
Date of Completion:April 2008 (as per schedule)

Kuantan Post Hydrogenation Project

Client:FPG Oleochemicals Sdn Bhd (FPG)
Year:2008
Location:Gebeng, Kuantan, Malaysia
Service:E.P.C
Date of Completion:April 2009 (as per schedule)

Ethane Maximizing (EMAX) Project

Client:Ethylene Malaysia Sdn Bhd (EMSB)
Year:2008
Location:Gebeng, Kuantan, Malaysia
Service:E.P.C.C.
Date of Completion:Sept 2009 (as per schedule)

Installation of Switch Condenser E-3330E in PA Plant

Client:BASF Petronas Chemicals Sdn Bhd (BPCSB)
Year:2005
Location:Gebeng, Kuantan, Malaysia
Service:E.P.C
Date of Completion:Apr 2006 (as per schedule)

Implementation of APC Package for DIB / Butamer

Client:MTBE Malaysia Sdn Bhd (MTBE)
Year:2004
Location:Gebeng, Kuantan, Malaysia
Service:E.P.C.
Date of Completion:Aug 2004 (as per schedule)

The Design, Supply, Construction and Completion of a Wastewater Upgrading Project

Client:FPG Oleochemicals Sdn Bhd (FPG)
Year:2004
Location:Gebeng, Kuantan, Malaysia
Service:C.C.
Date of Completion:Nov 2004 (as per schedule)

Cooling Tower Piping Works

Client:FPG Oleochemicals Sdn Bhd (FPG)
Year:2004
Location:Gebeng, Kuantan, Malaysia
Service:E.P.C.
Date of Completion:June 2004 (as per schedule)

N-Butane Plant Modification

Client:MTBE Malaysia Sdn Bhd (MTBE)
Year:2004
Location:Gebeng, Kuantan, Malaysia
Service:E.P.C.C
Licensor:U.O.P
Date of Completion:April 2005 (as per schedule)

Lines Diversion to LCB No.3

Client:BASF Petronas Chemicals Sdn Bhd (BPCSB)
Year:2003
Location:Gebeng, Kuantan, Malaysia
Service:E.P.C.C
Date of Completion:May 2004 (as per schedule)

Design, Supply, Construction & Completion of Glycerine Refinery Plant

Client:FPG Oleochemicals Sdn Bhd (FPG)
Year:2003
Location:Gebeng, Kuantan, Malaysia
Service:E.P.C.
Licensor:P&G
Date of Completion:Oct 2004 (as per schedule)

Sabah

Dalak Pipeline Project

Client:PETRONAS Carigali Sdn Bhd
Year:2014
Location:Labuan, Sabah
Service:E & Ps
Date of Completion:March 2016

Kedah

EPCC for Waste Water Treatment Plant (WWTP) Improvement Project (AQUA)

Client:PETRONAS Chemicals Fertiliser Kedah Sdn Bhd
Year:2022
Location:Gurun, Kedah
Service:EPCC
Date of Completion:Dec 2024